APPLIED BELL CURVE
PRODUCTS

One planning framework, built per industry.

Every suite works the same way: your plant's rules are modelled as constraints, a solver builds the plan, and your planners review and edit it. What changes is the model, built from your industry's machines up. Buy the full suite or its standalone module.

Primary slitter cutting a jumbo roll of film into customer rolls
INDUSTRY · 01 · PACKAGING FILMS

ABC for Packaging Films

Plans how every jumbo roll is cut into customer rolls, with the least trim and fewest knife changes.

MODULES · 3
Campaign PlannerIN DEVELOPMENTPlans production campaigns by material group across your film lines.
Slitting PlannerPlans how jumbo rolls are cut, with the least trim and setting changes.
Line PlannerIN DEVELOPMENTPlans each film line in detail, down to the material code.
View suite
Terry loom — loop pile forming at the fell
INDUSTRY · 02 · TERRY TOWEL

ABC for Terry Towel

Planning for integrated terry towel mills, from yarn dyeing to cutting, sewing and packing.

MODULES · 5
Yarn Dyeing PlannerIN DEVELOPMENTPlans yarn dye lots against weaving demand.
Warping PlannerIN DEVELOPMENTPlans warp beam preparation ahead of weaving.
Loom PlannerAssigns orders to looms and sequences them against weaving cutoffs.
Processing PlannerIN DEVELOPMENTPlans post-weaving processing of woven fabric.
CSP PlannerIN DEVELOPMENTPlans cutting, sewing and packing through to dispatch.
View suite
SHARED ACROSS EVERY SUITE

Built the same way, whatever you make.

Data you can date

Every screen shows when its order data was last refreshed, so you know what you are planning on.

Constraint model

Machine limits and plant rules are modelled as constraints. A plan that breaks one is refused.

Optimisation solver

Each plan is solved against clear goals, such as weaving cutoffs, changeover time or trim.

Planner override

Any plan can be edited by hand. Each change is checked against your constraints before it is saved.

Change without starting over

Correct a plan by hand without rerunning it, or test a change before you commit it.

SAP orders in, Excel out

Orders arrive from SAP each day. Plans export to Excel; slitting plans re-import in the same format.

HOW A DEPLOYMENT RUNS

From your data to a schedule on the floor.

  1. WEEKS 1–2Data audit

    We collect orders, masters and one real week of schedules, and fix what doesn't reconcile.

  2. WEEKS 2–4Constraint model

    Your planners and our engineers write down the rules the plant actually runs on.

  3. WEEKS 4–6Parallel run

    The solver plans alongside your team. Every difference is explained line by line.

  4. WEEK 6 ONWARDGo live

    Planners run the system daily. We tune the model as the plant changes.

See what better planning looks like for your plant.

Tell us how your plant plans today, and we'll show you where Applied Bell Curve can help.

Talk to Us